Replacing a commercial storefront requires more than removing the existing glass and framing. Opening dimensions, substrates, drainage, perimeter conditions, building occupancy, and adjacent finishes must be evaluated before new materials are installed.
Capital Glass evaluates the visible conditions and available project information before defining removal, protection, and replacement responsibilities. Concealed conditions may require adjustment after demolition begins.
- 01
- Existing Opening & Tolerances Review opening dimensions, existing framing, glass, entrances, hardware, perimeter finishes, drainage, and accessible substrate conditions.
- 02
- Access & Temporary Protection Plan demolition around occupancy, access, safety, temporary enclosure, weather exposure, noise, debris, and working hours.
- 03
- Framing, Glass & Drainage Coordinate storefront framing, glass compatibility, drainage, anchors, sealants, doors, hardware, and surrounding construction.
- 04
- Perimeter Transitions & Closeout Confirm patching boundaries, perimeter closures, finishes, protection, adjustments, cleaning, and the defined punch-list scope.