Drawing and detailing support can begin with a site visit to document the existing condition and collect accurate field measurements. Accessible openings and surrounding conditions are reviewed for plumb, level, square, plane alignment, and visible irregularities that may affect the glazing scope.
Field information is translated into coordinated glazing drawings that identify framing layouts, glass make-ups, entrances, hardware interfaces, anchors, closures, sealants, fabrication dimensions, tolerances, and adjacent conditions. The intended use, required review parties, revision limits, and final deliverables are established before drawing work begins.
- 01
- Field verification Record accessible opening dimensions, elevations, diagonals, plumb, level, square, plane alignment, substrates, perimeter conditions, and visible discrepancies before relying on the existing construction.
- 02
- Fabrication requirements Define the proposed framing system, glass make-up, entrances, hardware, anchors, sealants, closures, finishes, tolerances, and interfaces that must be resolved for fabrication and installation.
- 03
- Drawing development Develop elevations, plans, sections, details, dimensions, schedules, and notes appropriate to the agreed purpose, then incorporate coordinated review comments before release.
- 04
- Engineering and closeout coordination When sealed documents are required, coordinate review and stamping by an appropriately licensed third-party engineer, subject to the engineer’s scope, jurisdiction, calculations, and approval. Approved revisions and required records can then be organized for the project closeout package.